Verkehrssimulation Waidhofen an der Ybbs

No preview image was uploaded (this is optional).

Study program: Smart Engineering
Lecture: PT2:PuK PA bse_24w BB/VEB SS2026
Lecturer(s): Thomas Felberbauer
Team leader: Thomas Spitzhüttl
Team members:
  • Vanja Juric (se241321)
  • Thomas Spitzhttl (se242301)

Short description: Verkehrssimulation Waidhofen an der Ybbs mit SUMO

Project description:

A traffic impact assessment was prepared for 2026 for the planned construction of a building in Waidhofen an der Ybbs, located east of the Patertal municipal road, northwest of Expert Oberklammer, and southwest of the B121 Wiener Straße. The technical report contains traffic data, records, and forecasts related to the aforementioned construction project. Residents anticipate that the construction will lead to increased waiting times and traffic congestion for those arriving at and departing from Patertal. A 2D simulation is to be created to illustrate the traffic volume in the area where McDonald's plans to open. The data from the traffic impact assessment will serve as the basis for the simulation. This data is confidential and must be treated as such. The simulation model will be created in SUMO by a team working with Vanja Juric. A parallel version will be developed in Anylogic by another student team to compare the results and handling of the simulation tools.